此網頁需要支援 JavaScript 才能正確運行,請先至你的瀏覽器設定中開啟 JavaScript。

This webpage requires JavaScript to function properly. Please enable JavaScript in your browser settings.

Cette page web nécessite JavaScript pour fonctionner correctement. Veuillez activer JavaScript dans les paramètres de votre navigateur.

Esta página web requiere JavaScript para funcionar correctamente. Por favor, habilite JavaScript en la configuración de su navegador.

Diese Webseite benötigt JavaScript, um ordnungsgemäß zu funktionieren. Bitte aktivieren Sie JavaScript in Ihren Browser-Einstellungen.

Для корректной работы этой веб-страницы требуется поддержка JavaScript. Пожалуйста, включите JavaScript в настройках вашего браузера.

このウェブページを正常に動作するにはJavaScriptが必要です。ブラウザの設定でJavaScriptを有効にしてください。

이 웹 페이지는 올바르게 작동하려면 JavaScript가 필요합니다. 브라우저 설정에서 JavaScript를 활성화하십시오.

Tato webová stránka vyžaduje pro svůj správný chod podporu JavaScriptu. Prosím, povolte JavaScript v nastavení vašeho prohlížeče.

Ez a weboldal a megfelelő működéshez JavaScript támogatásra szorul. Kérjük, engedélyezze a JavaScript használatát a böngészőjében.

Questa pagina web richiede JavaScript per funzionare correttamente. Si prega di abilitare JavaScript nelle impostazioni del browser.

Šī tīmekļa lapa darbībai ir vajadzīgs JavaScript atbalsts. Lūdzu, ieslēdziet JavaScript savā pārlūkprogrammas iestatījumos.

Esta página da web requer JavaScript para funcionar corretamente. Por favor, ative o JavaScript nas configurações do seu navegador.

Deze webpagina vereist JavaScript om correct te functioneren. Schakel JavaScript in uw browserinstellingen in.

Ta strona wymaga obsługi JavaScript, aby działać prawidłowo. Proszę włączyć obsługę JavaScript w ustawieniach przeglądarki.

Laman web ini memerlukan JavaScript untuk berfungsi dengan betul. Sila aktifkan JavaScript dalam tetapan pelayar anda.

Halaman web ini memerlukan JavaScript untuk berfungsi dengan baik. Harap aktifkan JavaScript di pengaturan browser Anda.

เว็บไซต์นี้ต้องการ JavaScript เพื่อทำงานอย่างถูกต้อง โปรดเปิด JavaScript ในการตั้งค่าบราวเซอร์ของคุณ

Bu web sayfasının düzgün çalışması için JavaScript gereklidir. Lütfen tarayıcı ayarlarınızda JavaScript'i etkinleştirin.

Trang web này yêu cầu JavaScript để hoạt động đúng. Vui lòng kích hoạt JavaScript trong cài đặt trình duyệt của bạn.

Эн вэб хуудас нь зөв ажиллахын тулд JavaScript дэмжлэг авах шаардлагатай. Таны броузерын тохиргоонд JavaScript-ийг идэвхжүүлнэ үү.

ဒီဝန်ဆောင်မှုစာမျက်နှာကိုမှားယွင်းရန် JavaScript ကိုလိုအပ်ပါ။ သင့်ရဲ့ဘောဒီကိုပြင်ဆင်ရန် JavaScript ကိုဖွင့်ပါ။

ບໍ່ສາມາດເຮັດວຽກເວັບໄຊນີ້ໄດ້ຖ້າບໍ່ມີການສະຫລັບ JavaScript. ກະລຸນາໃຊ້ການຕັ້ງຄ່າຂອງເວັບໄຊໃຫ້ເປີດ JavaScript ກ່ອນ.

ទំព័រវេបសាយនេះត្រូវការ JavaScript ដើម្បីដំណើរការប្រើប្រាស់បានល្អ។ សូមបើក JavaScript នៅក្នុងការកំណត់របស់អ្នកក្នុងក

  緬甸當局公開邀請有關企業參與水力發電站修復項目之預先資格篩選 - 駐緬甸臺北經濟文化辦事處 Taipei Economic and Cultural Office in Myanmar :::
:::
瀏覽路徑: 回首頁 > 本處新聞 > 本處新聞

緬甸當局公開邀請有關企業參與水力發電站修復項目之預先資格篩選

緬甸電力暨能源部旗下發電公司(Electric Power Generator Enterprise) 於11月5日公開邀請有關企業參與水力發電站修復項目之預先資格篩選。緬甸政府已從日本JICA獲貸款,作為修復及改善克耶邦Baluchaung No.1 水力發電廠及曼德勒省 Sedawgyi 水力發電廠之設備、變電站與傳輸線設施性能之資金。

日期:2018年11月6日

貸款協議編號:MY-P22 dated 25th April, 2017

IFP編號:EPGE / HPR / Package3

有意申請者可至緬甸電力暨能源部旗下發電公司採購部提交書面申請及付一筆30萬緬幣的不退款費用購買一套完整的資格預審文件。資格預審將根據日本官方發展援助(ODA)貸款下適用的採購指南程序進行,並向符合條件之國家的所有申請人開放。預計將在2019年1月開始招標。資格預審申請文應以密封信封提交,並於2018年12月18日15:00(緬甸時間)之前送至指定地址(如原文),且明確標明“Application to Prequalify for Hydropower Plants Rehabilitation Project Package-3”。

原文如下

The Republic of the Union of Myanmar

Ministry of Electricity and Energy

Electric Power Generation Enterprise

Invitation for Prequalification

Hydropower Plants Rehabilitation Project

Date: 6th November, 2018

Loan Agreement No: MY-P22 dated 25th April, 2017

IFP No: EPGE/HPR/Package3

  1. The Government of the Republic of the Union of Myanmar has received a Loan from Japan International Cooperation Agency toward the cost of the Hydropower Plants Rehabilitation Project in the Republic of the Union of Myanmar.

The Project intends reduce the unplanned power outage and improve the remaining life of the power plants by rehabilitating the equipment of Baluchaung No.1 Hydropower Plant, Kayah State and Sedawgyi Hydropower Plant, Mandalay Region.

The works in contract packages 3 intends to rehabilitate and to improve the performance of substation facilities in both plants.

It is intended that part of the proceeds of this Loan will be applied to eligible payments under the contract resulting from the bidding for which this prequalification is conducted.

  1. The Electric Power Generation Enterprise intends to prequalify contractors and/or firms for Rehabilitation of Relevant Substation and Transmission Line Facilities in Hydropower Plants Rehabilitation Project.

The subjected Substations are two stations in the two Hydropower plants. For convenience, the facilities and functions as substation in these power plants are defined as substations in this document as follows:

Power plant name             Definition of plants in this Document

Baluchaung No.1              Baluchaung No.1 Substation

Hydropower plant

Sedawgyi Hydropower plant     Sedawgyi Substation

The project comprises Package 3 and other two packages as follows:

Package 1    Baluchaung No.1 Hydropower plant Generation facilities rehabilitation

Package 2    Sedawgyi Hydropower plantGeneration facilities rehabilitation

  1. It is expected that Invitation for Bids will be made in January 2019.
  2. Prequalification will be conducted through procedures in accordance with the applicable Guidelines for Procurement under Japanese ODA Loans, and is open to all Applicants from eligible source countries.
  3. Interested eligible Applicants may obtain further information from and inspect the Prequalification Documents during the office hour at;

Address: Project Director of Hydropower Plants Rehabilitation Project, Renewable Energy and Hydropower Plant Department Electric Power

Generation Enterprise (EPGE), Ministry of Electricity and Energy (MOEE) Building No. 27, Nay Pyi Taw, Myanmar

Phone : +95-67-8104269, +95-67-8104270

Facsimile number : +95-67-8104273

E-mail : renewablebranch@gmail.com

  1. A complete set of the Prequalification Documents may be purchased by interested Applicant(s) on the submission of a written Application to the address below and upon payment of a nonrefundable fee of 300,000 Kyats.

Address : Procurement Department

Electric Power Generation Enterprise (EPGE),Ministry of Electricity and Energy (MOEE) ,Building No. 27, Nay Pyi Taw, Myanmar

Phone : +95-67-8104279

Time : from 10:00 to 15:30 hr on November 6th (Tuesday) ~ 19th (Monday) 2018. (Myanmar Standard Time)

  1. Applications for prequalification should be submitted in sealed envelopes, delivered to the following address before 15:00hr on December 18th, 2018 (Myanmar Standard time) and be clearly marked “Application to Prequalify for Hydropower Plants Rehabilitation Project Package-3”

Address : Yadanar Hall

Ministry of Electricity and Energy (MOEE)

Building No. 27, Nay Pyi Taw, Myanmar

Phone : +95-9424685463, +95-9797137280